Dam of Bovilla
March 3, 2021
...
- Completion Year: 1998
- Height of Dam: H = 91.0 m
- Length of Dam Crest: L= 135 ml
- The volume of Dam Body: 65 million m3
- Element of Impermeability: Geosynthetic Membrane
- The capacity of Discharge System (Spillway): 365 m3/sec
- Purpose of Dam Construction/Operation: Water Supply
- River where is Dam: Terkuza River
- Location of Dam: Tirana
- Total Volume of Reservoir in max. water level: 78 000 000 m3
- The surface of Reservoir in max. water level: 3 750 000 m2
- The surface of River water Basin: 357 km2