07. November 2024

Dam of HEPP Banja

March 3, 2021
banje
...
  • Completion Year:                                               2016
  • Height of Dam:                                                 H = 80.0 m
  • Length of Dam Crest:                                     L= 910 ml
  • The volume of Dam Body:                                     4 million m3
  • Element of impermeability:                                     Clay Core
  • The capacity of the Discharge System (Spillway):       2190 m3/sec
  • Purpose of Dam Construction/Operation:      Production of Hydro energy  
  • River where is Dam:                                          Devoll River
  • Location of Dam:                                           Cerrik/ Elbasan
  • Total Volume of Reservoir in max. Water level:      415 000 000 m3
  • The surface of Reservoir in max. Water level:             18 700 000 m2
  • The surface of River water Basin:                               2 890 km2

Leave a Reply

Your email address will not be published. Required fields are marked *


Rreth nesh

Komiteti Kombëtar i Digave të Mëdha (KKDM) është organ i Këshillit të Ministrave i cili ushtron kontrollin e shtetit për sigurinë e digave dhe dambave si vepra të një rëndesie të vecantë dhe përfaqeson shtetin shqiptar ne Komisionin Ndërkombetar te Digave të Mëdha (ICOLD).



Postimet e Fundit